Projects Completed


Photos...

Heavy and Marine Construction & Flood Control Project

Location: San Juan, Puerto Rico
Client: U.S. Army Corps of Engineers
Contract Amount: $27,500,000
Rio Puerto Nuevo Project Contract 2A

This project was located in San Juan, Puerto Rico. This heavy and marine construction project involved pile load testing, pile driving of 18” diameter ...
read more


Photos...

Deer Island Pier, Bulkhead and Staging Area

Location: Boston, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $27,700,000
This project involved construction of the pier and bulkhead facility on Deer Island, The pier was founded on pipe piles with a cast-in-place concrete deck and included two roll-on roll-off bridges tha... read more


Photos...
Videos...

Removal of the Old Jamestown Bridge

Location: Jamestown, RI
Client: Rhode Island Department of Transportation
Contract Amount: $20,500,000

The project consisted of demolishing and disposing of the Old Jamestown Bridge between the towns of North Kingstown and Jamestown in Rhode Island . The demolition portion of this contract was appro... read more



Photos...

Boston Riser Project – Effluent Outfall Diffusers

Location: Boston, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $77,000,000
Work related to this project included the installation of 55, 250’ long, 30-inch diameter and 1¾-inch wall thickness FRP risers, lowered and grouted into a predrilled shaft in the seabed. Each ri... read more


Photos...

Dredging Quincy Bay

Location: Quincy, MA
Client: Commonwealth of Massachusetts Contract No. 3355
Contract Amount: $819,000
This job included the Dredging of approximately 70,000 CY of material including an entrance channel, transition area and mooring/docking basin by mechanical method wit... read more


Photos...

Northeast Gateway Project – Offshore Gas Transmission Line

Location: Quonset Point, RI
Client: Horizon Offshore
Contract Amount: $2,200,000
The work associated with this project was part of the Northeast Gateway Project. Cashman Equipment Corp. was hired to transport 18” and 24” concrete coated pipe to Pier 2 in Quonset Point , RI and loa... read more


Hubline Pipe Project – Offshore 30” Gas Transmission Line

Location: Boston, MA
Client: Duke Energy Gas Transmission Line
Contract Amount: $5,000,000
Cashman Equipment Corp. installed approximately 30 miles of 30” gas transmission pipe line offshore from Salem, MA to Weymouth, MA as a subcontractor to Stolt Offshore, Inc. Work performed by Cashman ... read more


Fore River – Marine Roll-On Roll-Off Facility

Location: Quincy, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $12,640,000
Work included two roll-on roll-off bridges that allowed trucks departing by barge to drive directly onto barges. The bulkhead was constructed of steel sheet piling with a concrete relieving platform b... read more


Photos...

Porter Street Combined Sewer Outfall

Location: Boston, MA
Client: Massachusetts Highway Department
Contract Amount: $35,842,000
This was one of the early CA/T projects. This project involved construction of a pair of concrete combined sewer outfall lines. The outfall was a concrete structure approximately 17 feet wide and 14 f... read more


Photos...

Bois D’Arc

Location: Louisiana
Client: Bois D'Arc
Contract Amount: $3,000,000
Driving wood pilings around exsisting well heads in 8 different locations, 48 piles installed. Installed 12” X 8” whalers around the pilings at three different elevations on each well to create protec... read more


Photos...

Helis Central Facility

Location: Black Bay, LA
Client: Petro Construction
Contract Amount: $350,000
Project involved working as directed alongside Helis Central Facility in Black Bay, La. JMC-86 (4100 Manitowoc/ Ringer mounted on 250'x72' barge) was utilized to set all heavy production equipment, cr... read more


Earth Moving Material Projects

Location: Boston, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $49,800,000
Work involved excavation and movement of approximately 4,000,000 CY of glacial till and 1,400,000 tons of tunnel muck. Approximately 2,000,000 CY of glacial till was removed all by barge and disposed ... read more


Photos...

Well Protection

Location: West Cameron, LA
Client: Callon Petroleum
Contract Amount: $400,000
Project involved fabricating piling jigs and installation of one (6) pile well protector. One 48'x120' pile for helideck and one (8) pile platform for production equipment. All work was done on locati... read more


Bridge Deck and Highway Reconstruction

Location: Various Locations in Massachusetts
Client: Massachusetts Turnpike Authority
Contract Amount: $8,360,000
Work involved bridge deck and highway reconstruction at several Massachusetts locations including Newton, Weston, Framingham and Grafton. ... read more


Photos...

Deer Island – Demolition of House of Correction and Fort Dawes

Location: Boston, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $22,972,000
Work involved demolition of the old prison and the old World War II concrete bunker fortification. ... read more


Photos...

Cashman Scrap & Salvage

Location: Louisiana
Client: Varies
Contract Amount: $0
Cashman Scrap & Salvage provides demolition and salvage services in the Gulf of Mexico. ... read more


Photos...
Videos...

Barge Building Program

Location: Various
Client: Cashman Equipment Corp
Contract Amount: $0
Cashman Equipment Corp builds a variety of ABS and inland barges in the United States and Asia to support the barge rental business. Currently, Cashman Equipment Corp is building 300-foot long, 250-fo... read more