Photos...
|
Heavy and Marine Construction & Flood Control Project
Location: San Juan, Puerto Rico
Client: U.S. Army Corps of Engineers
Contract Amount: $27,500,000
|
Rio Puerto Nuevo Project Contract 2A
This project was located in San Juan, Puerto Rico. This heavy and marine construction project involved pile load testing, pile driving of 18” diameter ...
read more |
|
|
|

Photos...
|
Deer Island Pier, Bulkhead and Staging Area
Location: Boston, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $27,700,000
|
|
This project involved construction of the pier and bulkhead facility on Deer Island, The pier was founded on pipe piles with a cast-in-place concrete deck and included two roll-on roll-off bridges tha...
read more |
|
|
|

Photos... Videos...
|
Removal of the Old Jamestown Bridge
Location: Jamestown, RI
Client: Rhode Island Department of Transportation
Contract Amount: $20,500,000
|
|
The project consisted of demolishing and disposing of the Old Jamestown Bridge between the towns of North Kingstown and Jamestown in Rhode Island . The demolition portion of this contract was appro...
read more |
|
|
|

Photos...
|
Boston Riser Project – Effluent Outfall Diffusers
Location: Boston, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $77,000,000
|
|
Work related to this project included the installation of 55, 250’ long, 30-inch diameter and 1¾-inch wall thickness FRP risers, lowered and grouted into a predrilled shaft in the seabed. Each ri...
read more |
|
|
|

Photos...
|
Dredging Quincy Bay
Location: Quincy, MA
Client: Commonwealth of Massachusetts Contract No. 3355
Contract Amount: $819,000
|
|
This job included the Dredging of approximately 70,000 CY of material including an entrance channel, transition area and mooring/docking basin by mechanical method wit...
read more |
|
|
|

Photos...
|
Northeast Gateway Project – Offshore Gas Transmission Line
Location: Quonset Point, RI
Client: Horizon Offshore
Contract Amount: $2,200,000
|
|
The work associated with this project was part of the Northeast Gateway Project. Cashman Equipment Corp. was hired to transport 18” and 24” concrete coated pipe to Pier 2 in Quonset Point , RI and loa...
read more |
|
|
|
|
Hubline Pipe Project – Offshore 30” Gas Transmission Line
Location: Boston, MA
Client: Duke Energy Gas Transmission Line
Contract Amount: $5,000,000
|
|
Cashman Equipment Corp. installed approximately 30 miles of 30” gas transmission pipe line offshore from Salem, MA to Weymouth, MA as a subcontractor to Stolt Offshore, Inc. Work performed by Cashman ...
read more |
|
|
|
|
Fore River – Marine Roll-On Roll-Off Facility
Location: Quincy, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $12,640,000
|
|
Work included two roll-on roll-off bridges that allowed trucks departing by barge to drive directly onto barges. The bulkhead was constructed of steel sheet piling with a concrete relieving platform b...
read more |
|
|
|

Photos...
|
Porter Street Combined Sewer Outfall
Location: Boston, MA
Client: Massachusetts Highway Department
Contract Amount: $35,842,000
|
|
This was one of the early CA/T projects. This project involved construction of a pair of concrete combined sewer outfall lines. The outfall was a concrete structure approximately 17 feet wide and 14 f...
read more |
|
|
|

Photos...
|
Bois D’Arc
Location: Louisiana
Client: Bois D'Arc
Contract Amount: $3,000,000
|
|
Driving wood pilings around exsisting well heads in 8 different locations, 48 piles installed. Installed 12” X 8” whalers around the pilings at three different elevations on each well to create protec...
read more |
|
|
|

Photos...
|
Helis Central Facility
Location: Black Bay, LA
Client: Petro Construction
Contract Amount: $350,000
|
|
Project involved working as directed alongside Helis Central Facility in Black Bay, La. JMC-86 (4100 Manitowoc/ Ringer mounted on 250'x72' barge) was utilized to set all heavy production equipment, cr...
read more |
|
|
|
|
Earth Moving Material Projects
Location: Boston, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $49,800,000
|
|
Work involved excavation and movement of approximately 4,000,000 CY of glacial till and 1,400,000 tons of tunnel muck. Approximately 2,000,000 CY of glacial till was removed all by barge and disposed ...
read more |
|
|
|

Photos...
|
Well Protection
Location: West Cameron, LA
Client: Callon Petroleum
Contract Amount: $400,000
|
|
Project involved fabricating piling jigs and installation of one (6) pile well protector. One 48'x120' pile for helideck and one (8) pile platform for production equipment. All work was done on locati...
read more |
|
|
|
|
Bridge Deck and Highway Reconstruction
Location: Various Locations in Massachusetts
Client: Massachusetts Turnpike Authority
Contract Amount: $8,360,000
|
|
Work involved bridge deck and highway reconstruction at several Massachusetts locations including Newton, Weston, Framingham and Grafton. ...
read more |
|
|
|

Photos...
|
Deer Island – Demolition of House of Correction and Fort Dawes
Location: Boston, MA
Client: Massachusetts Water Resources Authority
Contract Amount: $22,972,000
|
|
Work involved demolition of the old prison and the old World War II concrete bunker fortification. ...
read more |
|
|
|

Photos...
|
Cashman Scrap & Salvage
Location: Louisiana
Client: Varies
Contract Amount: $0
|
|
Cashman Scrap & Salvage provides demolition and salvage services in the Gulf of Mexico. ...
read more |
|
|
|

Photos... Videos...
|
Barge Building Program
Location: Various
Client: Cashman Equipment Corp
Contract Amount: $0
|
|
Cashman Equipment Corp builds a variety of ABS and inland barges in the United States and Asia to support the barge rental business. Currently, Cashman Equipment Corp is building 300-foot long, 250-fo...
read more |
|
|