Location: Boston, MA
Client: Duke Energy Gas Transmission Line
Contract Amount: $5,000,000
Cashman Equipment Corp. installed approximately 30 miles of 30” gas transmission pipe line offshore from Salem, MA to Weymouth, MA as a subcontractor to Stolt Offshore, Inc. Work performed by Cashman Equipment Corp. included: loading pipe and materials on barges, underwater pipe pulling, dredging and backfilling.
|
|