Location: Quonset Point, RI
Client: Horizon Offshore
Contract Amount: $2,200,000
The work associated with this project was part of the Northeast Gateway Project. Cashman Equipment Corp. was hired to transport 18” and 24” concrete coated pipe to Pier 2 in Quonset Point , RI and load the pipe in a sequence determined by Horizon Offshore onto ABS Barges.
|
|