Location: Louisiana
Client: Bois D'Arc
Contract Amount: $3,000,000
Driving wood pilings around exsisting well heads in 8 different locations, 48 piles installed. Installed 12” X 8” whalers around the pilings at three different elevations on each well to create protection for the producing wells. Installing grating and light stands. Also, drove pilings and installed supports and deck for a new boat dock at the exsisting platform.
Provided crane support to contract welders to rework old deck on the exsisting platform. Removing old equipmnent off of the exsisting platform.
|
|